Installation Bungaroo Bore 10

Projects

Installation Bungaroo Bore 10

Rio Tinto
|
Pilbara
|
$1.6M

Design and install bore

  • Design and install trailer mounted head works
  • Install HDPE pipe tie in to existing pipe
  • Install overhead HV power lines and circuit board panels
  • Install all associated telemetry