Cloudbreak – Garden Transfer Pond

Projects

Cloudbreak – Garden Transfer Pond

FMG
|
Pilbara
|
$7.0M

Construction of transfer pond.

  • Site clearing, grubbing and topsoiling
  • Foundation preparation and embankment construction
  • Pump pad construction to 400mm high, 70m x 40m
  • Pond lining
  • Supply and install pond level indicator (HDPE Post type)
  • Install PE100 white HDPE P12.5 pipe DN630