Upgrade and resurfacing of Rio Tinto airstrip.
- Profiling of existing sealing
- Stabilised base coarse
- Two coat seal
- Mobilisation of mobile asphalt batching plant
- 50mm asphalt overlay
- Runway grooving
- Line marking
- Fuel resistant sealing
Upgrade and resurfacing of Rio Tinto airstrip.