Projects

With independently certified Management Systems to international and national standards, our industry-leading systems and an alignment of management techniques and culture, clients can be confident that their project is in capable hands with Multiplant.

Industry leaders bear witness to our abilities in project management, safety, quality assurance and delivery. This is represented by the people we use and strong synergistic values we promote for a best for project philosophy.

Rail 053 Access Road Maintenance

Client: Roy Hill
Location: between the Port Rail loop at Boodarie and the Mine Loop located 110km north east of Newman
  • Bulk Earthworks
  • Unsealed road repairs and grading
  • Construction and reinstatement of roadside drainage
  • Culvert crossing construction and repairs
  • Rock reclamation and stockpiling
  • Supply and installation of roadside furniture

Hope Downs 4 Waste Fines Storage Facility In Pit Earthworks Construction and Commissioning

Client: Rio Tinto
Location: 100km north west of Newman
  • Unsealed access road earthworks
  • Supply and installation of culvert and service drains
  • Construction of dump ponds for pipeline access

Sino Iron Ore Project

Client: CITIC Pacific
Location: Cape Preston
  • Provision of various items of plant
  • Fleet maintenance services.

Hope Downs 4 Miscellaneous Earthworks, Sealing and Asphalt

Client: Rio Tinto
Location: 100km north west of Newman
  • Bulk earthworks
  • Pavement preparation
  • Sealing and asphalting
  • Culvert crossing construction and installation

Hope Downs 1 Miscellaneous Earthworks, Sealing and Asphalt

Client: Rio Tinto
Location: 100km north west of Newman
  • Bulk earthworks
  • Pavement Preparation
  • Sealing and asphalting
  • Culvert crossing construction and installation

Australian Defence Force - Bindoon Training Area Works

Client: Decmil
Location: Bindoon
  • Bulk earthworks
  • Swale and drainage construction
  • Repair and rehabilitate existing roads
  • Supply and installation of culverts
  • Building pads

Water Corporation - Hamilton Hill Reservoir DN900 MSCL Pipeline MagFlow Replacement

Client: OJG Engineering
Location: Hamilton Hill
  • Major shutdown of facilities
  • Excavation of trenching
  • Installation of trenching supports
  • Crane lifts for pipe spool installation
  • Backfill and reinstatement fo ground to levels
  • Supply and installation of manhole covers and conversions

Linfox/Vaughans Transport and Load-out Facility

Client: Vaughans
Location: Welshpool
  • 87,000BCM of bulk earthworks
  • Materials processing and conditioning
  • Removal from site of all existing site conditions including railways and asphalt and unsuitable materials
  • Detailed earthworks
  • Preparation for the installation of underground services required for the facility.

Degrussa Copper Mine Mine Earthworks

Client: Sandfire Resources
Location: Doolgunna - 60km Northwest Newman
  • Clearing of approximately 1.12 hectare of vegetation
  • Stripping of topsoil and stockpiling of the haul road for the Concentrate Quad Parking Access Road
  • Bulk earthworks were performed for the plant and workshop access road construction
  • Maintenance including upstream and downstream batter construction and protection
  • Culverts and pipeworks were completed including the construction of swales
  • Village car parks
  • Pads for product storage
  • ROM pads including laydowns and evaporative ponds with HDPE liner
  • Final rehabilitation

Hope Downs 4 Mine Earthworks and Permanent Village Expansion

Client: KBR
Location: 30km Northwest Newman
  • Construction of an addition to the existing bulk earthworks pad for the Village
  • Upgrades to the heavy haulage and access roads including road maintenance: road base, sealing, kerbing, line-marking, signage, sheeting and dust control
  • Car parks and drainage at site
  • Culverts and pipe works installation
  • Crane pads and lay down area construction
  • Rectification and tidy of prior scoped works and the rehabilitation of the borrow pit were included
  • Servicing of EPCM vehicles
  • Refuelling services

Christmas Creek Mine Earthworks

Client: FMG / Calibre
Location: 110km north of Newman
  • Bulk earthworks
  • 17km of manual haul access road construction
  • Conveyor corridor construction
  • Culvert installation, stormwater pipe works and floodways
  • Rock pitching
  • Mix and haul of all required materials
  • Operations included Project Management, 50 machines, 60 operators and full mechanical workshop
  • Earthworks for the permanent crushing facility for the EPCM were also performed whilst on site

West Angelas Aerodrome Refurbishment

Client: Rio Tinto
Location: 100km north west of Newman

Together with our joint venture partner Yurala Contracting Services:

  • Cement modification of runway, turns turning, taxiway and apron
  • Remediation of rutting, depressions, bitumen flushing and scouring
  • Runway drainage
  • Prime and bitumen seal all pavement surfaces
  • Line marking
  • Supply and installation of airstrip lighting

West Angelas Airstrip Resurfacing

Client: Rio Tinto
Location: 100km north west of Newman

Together with our joint venture partner Yurala Contracting Services:

  • Profiling of existing sealing
  • Two Coat Seal
  • Mobilisation of mobile asphalt batching plant
  • 50mm asphalt overlay
  • Runway grooving
  • Line marking
  • Fuel resistant sealing

Cape Lambert Road Surfaces Upgrade

Client: Rio Tinto
Location: Cape Lambert Port Facility

Together with our joint venture partner Yurala Contracting Services:

Cape Lambert Port Facility Upgrade.

  • Road Sealing
  • Upgrade of existing gravel roads and construction of new roads
  • Floodway construction
  • Installation of culverts, crossings and¬†drainage
  • Bitumen foam stabilisation
  • Prime, seal and asphalt
  • All road furnishings